Notice: Use of undefined constant E_STRICT - assumed 'E_STRICT' in /home/compu0/public_html/rototillerguy/system/codeigniter/Common.php on line 207

Notice: Use of undefined constant E_STRICT - assumed 'E_STRICT' in /home/compu0/public_html/rototillerguy/system/codeigniter/Common.php on line 217

A PHP Error was encountered

Severity: Notice

Message: Undefined variable: showmin

Filename: views/result.php

Line Number: 39

Step 1 of 3: (Soil Prep)  
 
Initial Tilling:  
Use a Pick Axe to first Remove the old Grass and Weeds from the Soil. Then Use the Pick Axe to chop up the soil to allow proper use of the RotoTiller to get down 6" to 8" inches deep, then Use the RotoTiller and really till up the soil.
 
Tilling Cost (etcost X $0.42) =
   
Small roots and rocks are to be expected and there will be no extra charge. Large Roots and Tree Stumps or Boulders and large rocks are not to be expected and there may be an additional charge of $60.00 an hour for the entire Crews time to remove this type of debre.  
   
Any existing Spinkler pipes that we break while Tilling, we will of course fix for free. Any repairs that were needed before we began digging are not covered but can also be fixed for $60.00 and hour plus the cost of parts.  
   
Disposal:  
Self Disposal
Dispose of the Old Grass and Weeds in your City Trash Can your self. We will pile up the trash and you the customer will fill your trash can each week in order to save on disposal fees.
 
Take it to the Dump
Have us dispose of the trash by hauling it away in our truck to the City Dump. The Dump charges us $60.00 and we charge another $60.00 for our time and gas, So $120.00 per pick up truck load.
 
$120 per truck load
2,000lbs each truck load
   
1 Cubic Yard contains 27 Cubic Feet.
1 Cubic Foot contains 12 1" inch layers that are 1 Square Foot
12 times 27 would give us the amount of Square Feet in a Cubic Yard (324), but we need to find out how many Square Feet that are 3" inches thick in a Cubic Foot (12/3 = 4). 4 3" inch layers that are each 1 Square Foot are contained within 1 Cubic foot. So 4 times 27 will give us how many Square Feet can be covered in a 3" layer of Material that is contained within 1 Cubic Yard.

 
Your etcost Square Foot area / 1 Cubic Yard Covering 108 square feet = You will Need 0 Cubic Yards to cover your area with a 3" inch layer of Material
 
   
$100 Minimum Charge Per Trip  
   
   
 
Spreading and Secondary Tilling
Invoice
Total for Rototilling your area
$180.00 Roto Tilling Cost
Notice: Use of undefined constant E_STRICT - assumed 'E_STRICT' in /home/compu0/public_html/rototillerguy/system/codeigniter/Common.php on line 207
$ Pick up and Delivery of Compost
$0 Roto Tiller Guy to spread around and mix it into the soil
$